Articles

Parking Lot Construction 2017

 
Yesterday, Fr. Gannon met with the liturgical designer for the Shrines in the new parking lot at 188 Street. Here are some pictures of the Shrines that will be designed for the area. Work on the entire project is scheduled to begin in September.   These are  part of the parking lot construction project.
 

Red Penguin Web Solutions Developed by Red Penguin Web Solutions ©2016-2018